Building permits are required for all new single family dwellings.Forms you will need:
- Building Permit Application (or through Cloudpermit)
- Schedule 1 (both for the house and duct design)
- Energy Efficiency Design Summary - Prescriptive Energy
Information you'll need to provide with these forms:
- Site plan indicating location of proposed building, including setbacks to property lines and grading plan approved by the developer's engineer if within a subdivision
- Construction plans including structural and architectural details
- Roof truss drawings, stamped by an engineer and marked reviewed by your designer
- Septic system design and permit (if applicable)
- Clearance from the Conservation Authority if you plan to build in a regulated area